Service / SC-02

Smoke control & AOV

Planned maintenance, functional testing, fault investigation and recovery for smoke control and automatic opening vent systems.

Discuss this requirement
SCOPELIFE SAFETY / SMOKE CONTROLICS / SC-02

The work

Smoke control and AOV maintenance, testing and recovery.

Smoke control depends on detection, control logic, power, actuators and mechanical plant. A healthy indication at the control panel does not prove that every part has operated.

PPM visits check the agreed controls, actuators, fans, dampers, power supplies, overrides, indications and interfaces.

What ICS can investigate

Check the complete operating sequence.

  • +Control panels and local controllers
  • +Detection and override inputs
  • +Actuators, dampers, fans and feedback signals
  • +Power supplies and changeover arrangements
  • +Interfaces with fire alarm and building controls

Outputs

Test results, findings and required work.

The report format and level of detail are agreed before the work starts.

PPM service record

Functional test records

Sequence and interface findings

Defect schedule with priorities

Recovery recommendations

Commissioning evidence

Contact ICS

Have the fault history and system records ready.

Discuss the work